Resumo
We are superseding Airworthiness Directive (AD) 2012-09-09 for all International Aero Engines AG (IAE) V2500-A1, V2525-D5, and V2528- D5 turbofan engines, and certain serial numbers (S/Ns) of IAE V2522-A5, V2524-A5, V2527-A5, V2527E-A5, V2527M-A5, V2530-A5, and V2533-A5 turbofan engines. AD 2012-09-09 required cleaning, eddy current inspection (ECI) or fluorescent penetrant inspection (FPI), and initial and repetitive ultrasonic inspections (USIs) of certain high-pressure compressor (HPC) stage 3 to 8 drums, as well as replacement of the drum attachment nuts. This new AD expands the affected population for initial and repetitive USIs of the HPC stage 3 to 8 drum, revises the inspection intervals, requires performing ECI or FPI, requires removal of the affected attachment nuts and any HPC stage 3 to 8 drum found cracked, and adds a mandatory terminating action. This AD was prompted by the discovery that additional attachment nuts for certain HPC stage 3 to 8 drums are affected. We are issuing this AD to prevent failure of the HPC stage 3 to 8 drum, which could result in uncontained drum failure, damage to the engine, and damage to the airplane.
Detalhes da diretiva
Número da AD
FAA-2009-1100
Número do documento
2015-12068
Tipo
Rule
Data de publicação
May 27, 2015
Data de vigência
July 1, 2015
Fabricante afetado
International Aero Engines AG Turbofan
Criticidade
important
Emergência
Não
Docket ID
Docket No. FAA-2009-1100
Tópicos
Documentos oficiais
Acompanhamento automatizado de conformidade de ADs
O AeroCopilot vincula ADs à sua aeronave e rastreia o status de conformidade. Incluído em todo plano a partir de US$ 9,99 por mês.
Unlock AD-to-aircraft matching, compliance tracking, recurrence schedule with a free AeroCopilot account.
Sign up free to unlock AD-to-aircraft matching, compliance tracking, recurrence scheduleFree forever · No credit card · Sourced directly from FAA & NOAA pipelines