Summary
We are superseding Airworthiness Directive (AD) 2012-09-09 for all International Aero Engines AG (IAE) V2500-A1, V2525-D5, and V2528- D5 turbofan engines, and certain serial numbers (S/Ns) of IAE V2522-A5, V2524-A5, V2527-A5, V2527E-A5, V2527M-A5, V2530-A5, and V2533-A5 turbofan engines. AD 2012-09-09 required cleaning, eddy current inspection (ECI) or fluorescent penetrant inspection (FPI), and initial and repetitive ultrasonic inspections (USIs) of certain high-pressure compressor (HPC) stage 3 to 8 drums, as well as replacement of the drum attachment nuts. This new AD expands the affected population for initial and repetitive USIs of the HPC stage 3 to 8 drum, revises the inspection intervals, requires performing ECI or FPI, requires removal of the affected attachment nuts and any HPC stage 3 to 8 drum found cracked, and adds a mandatory terminating action. This AD was prompted by the discovery that additional attachment nuts for certain HPC stage 3 to 8 drums are affected. We are issuing this AD to prevent failure of the HPC stage 3 to 8 drum, which could result in uncontained drum failure, damage to the engine, and damage to the airplane.
Directive Details
AD Number
FAA-2009-1100
Document Number
2015-12068
Type
Rule
Publication Date
May 27, 2015
Effective Date
July 1, 2015
Affected Manufacturer
International Aero Engines AG Turbofan
Criticality
important
Emergency
No
Docket ID
Docket No. FAA-2009-1100
Topics
Official Documents
Automated AD compliance tracking
AeroCopilot matches ADs to your aircraft and tracks compliance status. Included in every plan from $7.99 monthly.
Unlock AD-to-aircraft matching, compliance tracking, recurrence schedule with a free AeroCopilot account.
Sign up free to unlock AD-to-aircraft matching, compliance tracking, recurrence scheduleFree forever · No credit card · Sourced directly from FAA & NOAA pipelines