Skip to content

importantRule

AD FAA-2011-0278

Airworthiness Directives; General Electric Company (GE) GE90-110B1 and GE90-115B Turbofan Engines

Summary

We are adopting a new airworthiness directive (AD) for the products listed above, with certain part number (P/N) high-pressure compressor (HPC) stages 2-5 spools installed. This AD was prompted by an aborted takeoff caused by liberation of small pieces from the HPC stages 1-2 seal teeth and two shop findings of cracks in the seal teeth. This AD requires eddy current inspection (ECI) or spot fluorescent penetrant inspection (FPI) of the stages 1-2 seal teeth of the HPC stages 2-5 spool for cracks. This AD only allows installation of either HPC stator stage 1 interstage seals that are pregrooved or previously worn seals with acceptable wear marks to prevent heavy rubs. We are issuing this AD to detect cracks in the HPC stages 1-2 seal teeth due to heavy rubs that could result in failure of the seal of the HPC stages 2-5 spool, uncontained engine failure, and damage to the airplane.

Directive Details

AD Number

FAA-2011-0278

Document Number

2011-32832

Type

Rule

Publication Date

December 30, 2011

Effective Date

February 3, 2012

Affected Manufacturer

General Electric Company (GE) GE90-110B1 and GE90-115B Turbofan

Criticality

important

Emergency

No

Docket ID

Docket No. FAA-2011-0278

Topics

Air transportationAircraftAviation safetyIncorporation by referenceSafety

Official Documents

View all ADs for General Electric Company (GE) GE90-110B1 and GE90-115B Turbofan →

Automated AD compliance tracking

AeroCopilot matches ADs to your aircraft and tracks compliance status. Included in every plan from $9.99 monthly.

3 sections gated

Unlock AD-to-aircraft matching, compliance tracking, recurrence schedule with a free AeroCopilot account.

Sign up free to unlock AD-to-aircraft matching, compliance tracking, recurrence schedule

Free forever · No credit card · Sourced directly from FAA & NOAA pipelines