Skip to content

importantRule

AD FAA-2013-0018

Airworthiness Directives; Eurocopter Deutschland GmbH Helicopters

Summary

We are adopting a new airworthiness directive (AD) for Eurocopter Deutschland GmbH (Eurocopter) Model MBB-BK 117 C-2 helicopters. This AD requires determining if a certain serial-numbered bevel gear is installed in the tailrotor intermediate gear box (IGB). If such a bevel gear is installed in the IGB, this AD requires recording the bevel gear's reduced life limit in the Airworthiness Limitations section of the maintenance manual and on the component history card or equivalent IGB record. If the bevel gear's life limit has been reached or exceeded, this AD requires, before further flight, replacing the bevel gear with an airworthy bevel gear. This AD is prompted by the discovery that the tooth foot fillets in certain bevel gears fall below the minimum dimensions required in the design documents to ensure safe functioning of the bevel gear until it reaches its approved life limit. This AD's actions are intended to prevent failure of a bevel gear before it reaches its currently approved life limit, failure of the IGB, and subsequent loss of helicopter control.

Directive Details

AD Number

FAA-2013-0018

Document Number

2013-14848

Type

Rule

Publication Date

July 16, 2013

Effective Date

August 20, 2013

Affected Manufacturer

Eurocopter Deutschland GmbH

Criticality

important

Emergency

No

Docket ID

Docket No. FAA-2013-0018

Topics

Air transportationAircraftAviation safetyIncorporation by referenceSafety

Official Documents

View all ADs for Eurocopter Deutschland GmbH →

Automated AD compliance tracking

AeroCopilot matches ADs to your aircraft and tracks compliance status. Included in every plan from $9.99 monthly.

3 sections gated

Unlock AD-to-aircraft matching, compliance tracking, recurrence schedule with a free AeroCopilot account.

Sign up free to unlock AD-to-aircraft matching, compliance tracking, recurrence schedule

Free forever · No credit card · Sourced directly from FAA & NOAA pipelines