Summary
We are superseding Airworthiness Directive (AD) 2016-13-05 for all General Electric Company (GE) GE90-76B, GE90-77B, GE90-85B, GE90- 90B, and GE90-94B turbofan engines. AD 2016-13-05 required eddy current inspection (ECI) of the high-pressure compressor (HPC) stage 8-10 spool at each shop visit for all affected engines and ECI or ultrasonic inspection (USI) for certain affected engines. This new AD requires initial and repetitive on-wing USIs of the HPC stage 8-10 spool for certain engines prior to shop visit and ECI of all affected engines at each shop visit. This AD was prompted by analysis that the risk of the failure of an HPC stage 8-10 spool was excessive without repetitive USI prior to shop visit. We are issuing this AD to correct the unsafe condition on these products.
Directive Details
AD Number
FAA-2015-7491
Document Number
2017-07476
Type
Rule
Publication Date
April 14, 2017
Effective Date
May 19, 2017
Affected Manufacturer
General Electric Company Turbofan
Criticality
important
Emergency
No
Docket ID
Docket No. FAA-2015-7491
Topics
Official Documents
Automated AD compliance tracking
AeroCopilot matches ADs to your aircraft and tracks compliance status. Included in every plan from $7.99 monthly.
Unlock AD-to-aircraft matching, compliance tracking, recurrence schedule with a free AeroCopilot account.
Sign up free to unlock AD-to-aircraft matching, compliance tracking, recurrence scheduleFree forever · No credit card · Sourced directly from FAA & NOAA pipelines