Summary
The FAA is superseding Airworthiness Directive (AD) 2023-01- 07 for all GE Aviation Czech s.r.o. (GEAC) (type certificate previously held by WALTER Engines a.s., Walter a.s., and MOTORLET a.s.) Model H75- 100, H75-200, H80, H80-100, H80-200, H85-100, and H85-200 engines. AD 2023-01-07 required revising the airworthiness limitations section (ALS) of the existing engine maintenance manual (EMM) and the operator's existing approved maintenance or inspection program, as applicable, to incorporate updated coefficients and recalculate the cycles accumulated on critical parts. Since the FAA issued AD 2023-01- 07, the manufacturer revised the ALS of the EMM to introduce new and more restrictive airworthiness limitations and associated thresholds and intervals for life-limited parts, which prompted this AD action. This AD requires revising the ALS of the existing EMM and the operator's existing approved engine maintenance or inspection program, as applicable, to incorporate new and more restrictive instructions and associated thresholds and intervals for life-limited parts, as specified in a European Union Aviation Safety Agency (EASA) AD, which is incorporated by reference (IBR). The FAA is issuing this AD to address the unsafe condition on these products.
Directive Details
AD Number
FAA-2023-1811
Document Number
2024-01218
Type
Rule
Publication Date
January 23, 2024
Effective Date
February 27, 2024
Affected Manufacturer
GE Aviation Czech s.r.o. (Type Certificate Previously Held by WALTER Engines a.s., Walter a.s., and MOTORLET a.s.)
Criticality
routine
Emergency
No
Docket ID
Docket No. FAA-2023-1811
Topics
Official Documents
Automated AD compliance tracking
AeroCopilot matches ADs to your aircraft and tracks compliance status. Included in every plan from $7.99 monthly.
Unlock AD-to-aircraft matching, compliance tracking, recurrence schedule with a free AeroCopilot account.
Sign up free to unlock AD-to-aircraft matching, compliance tracking, recurrence scheduleFree forever · No credit card · Sourced directly from FAA & NOAA pipelines