Skip to content

routineRule

AD FAA-2017-0668

Airworthiness Directives; General Electric Company Turbofan Engines

Resumen

We are adopting a new airworthiness directive (AD) for all General Electric Company (GE) CF6-80A, -80A1, -80A2, and -80A3 turbofan engines. This AD was prompted by high cycle fatigue (HCF) cracking of the low-pressure turbine (LPT) stage 3 nozzles. This AD requires replacement of the LPT stage 3 nozzles, part numbers (P/Ns) 9290M52P05 and 9290M52P06, installed. We are issuing this AD to address the unsafe condition on these products.

Detalles de la directiva

Número de AD

FAA-2017-0668

Número de documento

2018-06738

Tipo

Rule

Fecha de publicación

April 6, 2018

Fecha de entrada en vigor

May 11, 2018

Fabricante afectado

General Electric Company Turbofan

Criticidad

routine

Emergencia

No

Docket ID

Docket No. FAA-2017-0668

Temas

Air transportationAircraftAviation safetyIncorporation by referenceSafety

Documentos oficiales

Ver todas las ADs de General Electric Company Turbofan →

Seguimiento automatizado de cumplimiento de ADs

AeroCopilot asocia las ADs a su aeronave y rastrea el estado de cumplimiento. Incluido en cada plan desde $7.99 al mes.

3 sections gated

Unlock AD-to-aircraft matching, compliance tracking, recurrence schedule with a free AeroCopilot account.

Sign up free to unlock AD-to-aircraft matching, compliance tracking, recurrence schedule

Free forever · No credit card · Sourced directly from FAA & NOAA pipelines