Skip to content

routineRule

AD FAA-2020-1116

Airworthiness Directives; Pratt & Whitney Turbofan Engines

Resumen

The FAA is superseding Airworthiness Directive (AD) 2012-04-15 for all Pratt & Whitney (PW) JT9D-3A, JT9D-7, JT9D-7A, JT9D-7AH, JT9D- 7F, JT9D-7H, JT9D-7J, JT9D-7Q, JT9D-7Q3, JT9D-7R4D, JT9D-7R4D1, JT9D- 7R4E, JT9D-7R4E1, JT9D-7R4E4, JT9D-7R4G2, JT9D-7R4H1, JT9D-20, JT9D- 20J, JT9D-59A, and JT9D-70A (JT9D) model turbofan engines. AD 2012-04- 15 required revisions to the Airworthiness Limitations Section (ALS) of the manufacturer's Instructions for Continued Airworthiness (ICA) to include required enhanced inspection of selected critical life-limited parts at each piece-part opportunity. AD 2012-04-15 also required additional revisions to the ALS of the manufacturer's ICA for JT9D model turbofan engines. This AD requires revising the required inspections of selected critical life-limited parts specified in the ALS of the manufacturer's ICA and, for air carriers, to the existing continuous airworthiness air carrier maintenance program (CAMP). The FAA is issuing this AD to address the unsafe condition on these products.

Detalles de la directiva

Número de AD

FAA-2020-1116

Número de documento

2021-08327

Tipo

Rule

Fecha de publicación

April 22, 2021

Fecha de entrada en vigor

May 27, 2021

Fabricante afectado

Pratt & Whitney Turbofan

Criticidad

routine

Emergencia

No

Docket ID

Docket No. FAA-2020-1116

Temas

Air transportationAircraftAviation safetyIncorporation by referenceSafety

Documentos oficiales

Ver todas las ADs de Pratt & Whitney Turbofan →

Seguimiento automatizado de cumplimiento de ADs

AeroCopilot asocia las ADs a su aeronave y rastrea el estado de cumplimiento. Incluido en cada plan desde $7.99 al mes.

3 sections gated

Unlock AD-to-aircraft matching, compliance tracking, recurrence schedule with a free AeroCopilot account.

Sign up free to unlock AD-to-aircraft matching, compliance tracking, recurrence schedule

Free forever · No credit card · Sourced directly from FAA & NOAA pipelines